1,773 East Coast Campus Undergraduates to Relocate in Batches from July to September
By STU News
East Coast CampusrelocationundergraduatesStudent Affairs Office
It is reported that the university will relocate East Coast Campus undergraduates back to Sangpu Mountain Campus in batches from July to September 2026, involving 1,773 students across four colleges.
Relocation Schedule
| Date | College | Current Building | Students | Destination |
|---|---|---|---|---|
| Jul 6 | Cheung Kong Art & Design College | East Campus Building H | 243 | Dexin College |
| Jul 10 | Chemistry & Chemical Engineering | East Campus Building B | 231 | Zhixing College |
| Mid-Sep | School of Science | East Campus Building H | 403 | Zhicheng College |
| Sep 5–6 | Engineering College | East Campus Building B | 896 | Phase 2, Bldg 1 & 2 |
Guidelines
- Students are expected to clean their dormitories before checking out
- Keep valuables with you during the move; report any loss to your counselor immediately
- Relocation vehicles will be arranged separately for passengers and belongings, organized by college
- Schedules are subject to adjustment per college notice
College contacts:
| College | Contact | |
|---|---|---|
| School of Science | Chen Zegong | zegongchen@stu.edu.cn |
| Engineering College | Zhang Xin | xinzhang@stu.edu.cn |
| Chemistry & Chemical Engineering | Miao Qimei | qmmiao@stu.edu.cn |
| Cheung Kong Art & Design College | Lai Yannan | ynlai@stu.edu.cn |
Source: STU OA Notice (Student Affairs Office)