Notices

Sangpushan Campus Power Outage Notice: May 23–24

By STU News
Power OutageSangpushan CampusInfrastructure

Outage Schedule

Due to the construction of a new teaching and laboratory building, two 10KV high-voltage power lines between Switch Station No. 2 and No. 1 will be relocated. Power loads will be switched in two phases:

PhaseTimeAction
1stMay 23 (Saturday), 12:00 PM (adjusted from 2:00 PM)Load transferred to backup high-voltage line
2ndMay 24 (Sunday), 1:00 PM (adjusted from 2:00 PM)Load switched back to main high-voltage line

Each switch will cause a 5 to 15-minute power outage in affected areas.

Affected Areas

All 16 transformers under Switch Station No. 1 are affected, including:

  • Student dormitories: Buildings A–F, L, Y, P
  • Dining & shops: 2nd and 3rd canteens, commercial area
  • Teaching areas: Teaching Buildings C, D, G; Science Building; Engineering Building; Liberal Arts Building; Technology Building
  • Colleges & arts: Shude College, Art College
  • Administration: Administration Center, East/West Administration Buildings
  • Faculty housing: High-rise faculty apartments, faculty dormitories A1–A14, B1–B16
  • Others: Network Center, Auditorium, Old Gymnasium, Campus Hospital, Kindergarten, Affiliated Middle/Primary Schools

Contact

86502489 / 86502710

Please prepare accordingly and note the outage times.

Source: STU OA Notice (Infrastructure Department, Resource Management Department)